• SlopppyEngineer@lemmy.world
    link
    fedilink
    English
    arrow-up
    21
    ·
    2 months ago

    It’s why critical equipment has a very tight delivery deadline. If it arrives a minute late it’s assumed somebody tampered with it along the supply chain and the equipment is rejected.